Edudorm Facebook

Automobile System Test and Evaluation Master Plan (TEMP)

Questions and Topics We Can Help You To Answer:
Paper Instructions:

Using the system operational requirements document (ORD) developed previously and as a baseline, develop the system test and evaluation master plan (TEMP). Use the research done in a previous assignment on the TEMP to help you with this assignment.

Specifically, the test and evaluation management plan (TEMP) must consider the following (Blanchard & Fabrycky, 2006):

Identify tests to be accomplished and items to be evaluated. As defined in the text, show the layout and evolution of the test requirements. Show how you intend to test the items from the operational requirements documents to ensure that the requirements are met.
Identify the office of primary responsibility for conducting the tests and the personnel and facilities to provide ongoing test support.
Include a description of the test location, including the local political, economic, and social factors, logistics, and test environment (e.g., arctic, desert, mountainous, or flat terrain, facilities, safety, and security concerns).
Include a description of the test preparation phase for each testing as required.
Include a description of the formal test phase.
Plan to determine when to reject test results and retest.
Provide a description of the final test report, including any recommendations for corrective action, format, distribution, and feedback.
Any figures, tables, or other supporting documentation needs to be pasted in the Word document.

226 Words  1 Pages
Get in Touch

If you have any questions or suggestions, please feel free to inform us and we will gladly take care of it.

Email us at support@edudorm.com Discounts

LOGIN
Busy loading action
  Working. Please Wait...